PS.22.24-I60.BS
PS.22.24-I60.BS
One layer of PROMATECT®-S board at each side of the partition
Horizontal framing tracks, comprised of 100mm x 3mm thick flat steel plate, at 2500mm centres or at every board horizontal edge
Mineral wool infill to cavity between boards with joints staggered 300mm in between
Vertical framing steel angles or channels at 600mm centres or at every board vertical edge (these framing centres may vary depending on the required dimension and fire resistance of the partition system)These framing steel angles or cannels should be off set so that there is a clear space between opposing angles of a minimum 10mm to prevent heat transfer through the construction
Top and bottom framework forming tracks, typically comprised of steel channels, fixed to substrate using 40mm long M10 masonry anchors at nominal 500mm centres
35mm long M6 Teks screws at nominal 200mm centres
Steel angle cleats joining top and bottom framework (alternatively, joints between framing can be welded)
Welded joint
Caulk all perimeter gaps with PROMASEAL®-A Acrylic Sealant to achieve the required fire resistance and/or acoustic performance