Promat International
Promat Australia
Downloads
Search
Home
Products
Applications
Markets
Building Sectors
Tunnel
Oil & Gas
Marine
High Performance Insulation
BIM
Reference
News
About Us
Corporate Information
EHS
History
R&D
Supply Chain
Contact Us
Contact Form
Locations
Promat International
Promat Australia
Downloads
Homepage
Systems
Steel stud
PH.22.36-2L.BS
PH.22.36-2L.BS
Two layers of PROMATECT®-H board at both sides of steel studs, all joints should be staggered at minimum 610mm in both directions
Mineral wool infill to cavity between boards
Galvanised steel studs (allow appropriate expansion at top horizontal track, no allowance at this track for loadbearing purposes)
25mm long self-tapping screws at nominal 300mm centres for first layer board, and 38mm self-tapping screws at nominal 300mm centres for second layer board. Joints do need not to coincide with studs, joints in second layer not coinciding with studs stitched to first layer using 25mm long laminating screws at nominal 300mm centres
60mm long M6 masonry anchors at nominal 500mm centres
Caulk all perimeter gaps with PROMASEAL®-A Acrylic Sealant to achieve the required fire resistance and/or acoustic performance
Related documents