Application  >  E&M Services Enclosures  >  Electrical Cable Enclosure  >  Internal Fire (PH/PL/PE)
 
   
 
  Hong Kong Singapore Australia Malaysia India
 
Internal Fire

With up to 120 minutes fire resistance
Integrity & Insulation
Tested to BS476: Part 20 & AS1530: Part 4 requirement

PROMATECT®-H / PROMATECT®-L / PROMATECT®-L500
Stability Rating Integrity Rating Insulation Rating
30 minutes 30 minutes 30 minutes
60 minutes 60 minutes 60 minutes
90 minutes 90 minutes 90 minutes
120 minutes 120 minutes 120 minutes

Internal fire   3-sided enclosure   2-sided enclosure   Cables & Enclosure support
Inspection opening   PROMASEAL® Ventilation Grille & Promat Ventbox   PROMASEAL® Ventilation Grille   Opening sealed with PROMASEAL® AN Sealant

Electrical Cable Enclosure - Internal fire

Stability/Integrity/Insulation Table 3:
For stability, integrity in fire compartment / Insulation
in adjacent compartment

Lid type Thickness of board for different FRL (minutes) Board type
30 60 90 120
Fixed 15mm 30mm 35mm 40mm PROMATECT®-H
Fixed 20mm 30mm 35mm 40mm PROMATECT®-L or
PROMATECT®-L500

Stability/Integrity/Insulation Table 4:
For stability, integrity and insulation in fire
compartment

Lid type Thickness of board for different FRL (minutes) Board type
30 60 90 120
Fixed 20mm 35mm 40mm 50mm PROMATECT®-H
Fixed 25mm 35mm 40mm 52mm PROMATECT®-L or
PROMATECT®-L500
FRL = Fire Resistance Levels
PROMATECT®-H, PROMATECT®-L or PROMATECT®-L500

The board thicknesses given in the tables 3 & 4 will ensure that the stability, integrity and insulation of the duct will be maintained when exposed to fully developed cellulosic internal fire (BS476 curve). For ducts which are not required to satisfy insulation criteria, and for larger ducts, please consult Promat Technical Department.

Wall penetrations
Wall penetrations

System Specification

Electrical cable enclosures are to be constructed using PROMATECT®-H, PROMATECT®-L or PROMATECT®-L500 matrix engineered mineral boards all in accordance with the Architectural Specification in the manufacturer’s handbook. Relevant constructions are to be selected according to the required FRL of 30/60/90/120 minutes of the selected elements. All printed installation details are to be followed to ensure approval to BS476: Part 20 or AS1530: Part 4. All work to be certified by installer in an approved manner.