Duct span maximum up to 10 metres

With up to 120 minutes & 240 minutes fire resistance
Integrity only
Integrity & Insulation
Tested to BS476: Part 24 & AS1530: Part 4 requirement

PROMATECT®-H
Board Thickness Stability
Rating
Integrity
Rating
Insulation
Rating
12mm  120 minutes 120 minutes -
15mm* 120 minutes 120 minutes 120 minutes
20mm (Duct A) 180 minutes 180 minutes 90 minutes
20mm (Duct B) 240 minutes 240 minutes 30 minutes
25mm  240 minutes 240 minutes 30 minutes
25mm* 240 minutes 240 minutes 240 minutes
* with 1-layer mineral wool clad externally

Duct span up to 10 metres Wall penetration fixing Option fixing Mineral wool clad externally


Duct span maximum up to 10 metres wide

The above construction of self-supporting fire resistant encasements around is up to 10m wide. Please consult Promat Technical Department for duct width over 12m. For impact resistant systems in accordance with the criteria BS5669: Part 1 exposed to external and internal fire, 20mm or 25mm thick PROMATECT®-H boards are required. Insulation will be as Duct type B (exposed to internal fire).

Duct span maximum up to 10 metres

With up to 120 minutes & 240 minutes fire resistance
Integrity only
Tested to BS476: Part 24 & AS1530: Part 4 requirement

PROMATECT®-L
Board Thickness Stability
Rating
Integrity
Rating
Insulation
Rating
25mm  120 minutes 120 minutes -
25mm  240 minutes 240 minutes -

Self-supporting ducts provide an economical and fire safe method of constructing natural and mechanical smoke extract and ventilation ductwork without a steel lining. Lengths of the system can be prefabricated off-site or constructed on site using the applicable board type. This ensures that time spent on site is kept to a minimum, with little or no disruption to other trades.


Duct span maximum up to 10 metres wide

For selection of board thickness, it will not only depend on the required fire performance but also on the internal cross section of the duct and the operating pressure(s). With large ducts and medium to high operating pressures, internal stiffeners may be required.
more...

Download this full application detail on PDF version. PDF download


 
 
 
   © Copyright 2008 Promat International (Asia Pacific) Ltd. All Right Reserved.