|
|
 |
 |
 |
WIDE -
Duct span between 3000mm to maximum 6000mm
 |
With up to 120 minutes & 240 minutes fire resistance |
 |
Integrity & Insulation |
 |
Tested to BS476: Part 24 & AS1530: Part 4 requirement |
For duct spanning between 3000mm to maximum 6000mm. Additional support channel at mid span are
required,
please consult Promat Technical Department for construction details.


Duct span between 3000mm to maximum 6000mm wide
Fire resistant ducts can be formed where the substrate
from which the steel duct is supported provides protection
to some areas, thus 1, 2 and 3-sided solutions in combination
with walls and ceilings are available. more...
|
Download this full application detail
on PDF version. |
 |
|
|