Concrete/Brick Wall Upgrading, Steel Hat Fixing Method
For loadbearing upgrading, the concrete cover to the reinforcing at the non-board side must be of minimum 30mm thick for 120 minutes
wall or minimum 50mm thick for 240 minutes wall.
The board thickness of the protection material is relevant to the strength of the concrete and the cover to the reinforcement.
In some instances, e.g. high strength (Grade B70), PROMATECT®-H 50mm
is needed for a 120 minutes performance to RWS. This situation applies to all exposure curves.
|