The following is the standard architectural specification for suspended ceiling system using PROMATECT®-H. The designer must determine the suitability of the design to the application and requirements before undertaking or constructing any works relating to the specifications and where in doubt should obtain the advice of a suitably qualified engineer.

Fire Attack From Below / Loadbearing

60/120/240 minutes* fire rating, loadbearing capacity, integrity and insulation in accordance with the criteria of BS476: Part 23: 1987.

 
Supporting Structure

Care should be taken that any structural element by which the ceiling system is supported, e.g. a beam, floor or wall, has at least an equivalent fire resistance.

 
Lining Boards

6mm/12mm* thick PROMATECT®-H matrix engineered mineral boards as manufactured by Promat International (Asia Pacific) Ltd. All joints to be coincident with steel framing. Standard board dimensions 1220mm x 2440mm x 6mm/12mm*.

 
Fixing

For exposed grid type steel beam protection suspended ceiling, perimeter galvanised steel angles 32mm x 19mm x 0.5mm thick will be fastened to the wall with 50mm x M6 metal anchors at 500mm maximum centres. Exposed primary T-grid will be positioned at 600mm nominal centres and suspended by steel wire of minimum 2mm diameter at 1200mm centres. Secondary T-grid will be positioned at 1200mm centres, simply resting on the primary T-grid at both ends. Exposed grid system should include expansion cut-outs in main T’s.

The boards 9mm thick will be fitted within the T-grid.

For concealed grid type steel beam protection suspended ceiling, perimeter galvanised steel angles 38mm x 19mm x 0.5mm thick will be fastened to the wall with 50mm x M6 metal anchors at 500mm maximum centres. Steel primary channels 50mm x 27mm x 0.6mm will be positioned at 610mm nominal centres and suspended by steel hangers at 1200mm centres. Secondary channels will then be positioned at 1220mm centres and fixed to the primary channels.

The boards 12mm thick will be fixed to the underside side of the framework with self-tapping screws at 200mm maximum centres, a minimum of 12mm from the board edge. Board joints must coincide with the steel channels.

Mineral wool, 50mm thick x 45kg/m3 nominal density will be placed over the ceiling.

 
Tests & Standards

The complete system along with material and framing is tested and/or assessed to meet the requirements of BS476: Part 23.

 
Jointing

Plain butt joints between machined edges of boards. (1)
Joints filled in preparation for painting. (2)
Joints filled and taped in preparation for decoration. (3)

 
Follow-on Trades

Surface of boards to be prepared for painting/plastering/tiling(4) in accordance with manufacturer’s recommendations.

 
NOTES:
  • (1), (2), (3), (4), * delete as appropriate.
  • Perimeter gaps will be filled with fire resistant PROMASEAL® AN Acrylic Sealant.
 